← Back

City: Urgench

07

Additional Services in Urgench

Khorezm, seasonal hotel and museum load. Design and installation by LumArt Engineering.

Working in the region

Urgench's hotels and museums follow seasonal occupancy patterns and need regular servicing under dry-climate conditions. LumArt Engineering integrates low-voltage systems in active buildings and performs planned tuning ahead of peak visitor periods.

Logistics

About 1000 km northwest: integration kits ship ahead; travel and tuning are planned across several days.

What is included

  • Smart home / BAS
  • Audio and video systems
  • Building Management System (BMS)
  • Electrical and low-voltage systems
  • System service contracts
  • Consulting and project audit

Facts

Low-voltage systems integrate in active buildings without closing the season.

Planned tuning runs ahead of peak visitor periods.

Dry-climate joint sealing and outdoor node placement are part of every design.

How we work

01

Consultation

Goals and budget defined.

02

Proposal

Concept and commercial offer prepared.

03

Delivery

Installation and integration.

04

Handover

Testing and documentation.

05

Service

Support and scheduled maintenance.

Benefits

Single supplier for all systems

Cross-integration of solutions

Warranty on all works

Dedicated project manager

Request a quote

Leave a request — our engineer will prepare a commercial proposal.

CEO

Kim Artur

+998 91 772 66 88

Marketing dept.

Kovreina Kamila

+998 77 497 80 78
Main service page

This service in other cities

Open the same service in another city

swipe →

Services

Other services — Urgench

All LumArt services in this city

swipe →